160.92 TOLL FACILITY REPLACEMENT PROJECTS.
When a highway project in the metropolitan area has been scheduled in the department's
six-year work program but is designated as a toll facility, the commissioner shall substitute in the
work program a similar highway project in the metropolitan area.
History: 1993 c 211 s 9