103I.401 ELEVATOR BORINGS.
Subdivision 1.
Permit required. (a) A person may not construct an elevator boring until a
permit for the hole or excavation is issued by the commissioner.
(b) The elevator boring permit preempts local permits except local building permits, and
counties and home rule charter or statutory cities may not require a permit for elevator borings.
Subd. 2.
License required. A person may not construct an elevator boring unless the person
possesses a well contractor's license or an elevator boring contractor's license issued by the
commissioner.
Subd. 3.
Sealing. A well contractor or elevator boring contractor must seal a hole or
excavation that is no longer used for an elevator boring. The sealing must be done according to
rules adopted by the commissioner.
Subd. 4.
Report. Within 30 days after completion or sealing of an elevator boring, the person
doing the work must submit a report to the commissioner on forms provided by the commissioner.
History: 1989 c 326 art 3 s 24; 1994 c 557 s 24; 1997 c 203 art 2 s 6; 2005 c 106 s 29