103D.801 PROCEDURE WHEN CONTRACT IS NOT LET.
If all of the bids received are for a price more than 30 percent greater than the engineer's
estimate in the engineer's report, or for a price in excess of the benefits less damages and other
costs, the managers shall follow the procedure described in section
103E.511.
History: 1990 c 391 art 4 s 63