103D.801 Procedure when contract is not let.
If all of the bids received are for a price more than 30 percent greater than the engineer's estimate in the engineer's report, or for a price in excess of the benefits less damages and other costs, the managers shall follow the procedure described in section 103E.511.
HIST: 1990 c 391 art 4 s 63