Reconditioning projects for natural preservation routes, designated national forest highways within national forests, and state park access roads within state parks must meet or exceed the minimum dimensions indicated in the following design chart.
TYPE I, II, OR III ROUTE
Proposed Design Strength | Pavement Width | Shoulder-to-Shoulder Width |
(tons) | (feet) | (feet) |
7 | 22 (a) | 26 (a) |
(a) Natural preservation routes may be reconditioned to existing pavement and shoulder widths.
Widths of bridges to remain in place must equal pavement width. A bridge narrower than these widths may remain in place if the bridge does not qualify for federal-aid bridge funds. H 15 loading is required.
20 SR 1041; 23 SR 1455; 24 SR 1885; 29 SR 449
October 15, 2007
Official Publication of the State of Minnesota
Revisor of Statutes