The applicant shall provide data on wastes and emissions associated with construction or operation of the facility, including:
the types and estimated amounts of gaseous and particulate emissions into the air that would occur during full operation of the pipeline from each emission source, and the location and nature of the release point;
the locations, routes, and final receiving waters for any discharge points, and for each discharge point the source, the amount, and the nature of the discharge;
any area from which runoff may occur, potential sources of contamination in the area, and receiving waters for any runoff; and
the maximum noise levels (in decibels, A scale) expected along the route and the expected maximum increase over ambient noise levels.
L 1983 c 289 s 115
November 14, 2003
Official Publication of the State of Minnesota
Revisor of Statutes