Each application for a coal slurry or coal liquids pipeline shall contain a description of alternatives available to the applicant that differ significantly from the proposed facility with respect to location, size, timing, or design.
§
A.
If the alternative is another pipeline, all of the information required by part 7855.0400, items A to C shall be submitted for the alternative. The applicant shall also indicate the reasons for rejecting the alternative.
§
B.
If the alternative is not a pipeline, the description of the alternative shall include the following information, if applicable:
§
(1)
the location of the alternative, to the fullest extent known;
§
(2)
the dimensions and design capacity of the alternative;
§
(3)
a schematic drawing showing major components of the alternative;
§
(4)
a map showing the planned location of the facility and its interconnections with energy transportation systems;
§
(5)
the probable date for commencing construction and the probable in-service date;
§
(6)
the estimated installed cost of the alternative in current dollars;
§
(7)
the estimated maintenance requirements of the alternative;
§
(8)
the estimated economic life of the alternative; and
§
(9)
the reasons why the alternative was rejected.