For the proposed pipeline, the applicant shall provide the following information:
estimated range of minimum trench or ditch dimensions including bottom width, top width, depth, and cubic yards of dirt excavated;
rights-of-way sharing or paralleling: type of facility in the right-of-way, and the estimated length, width, and acreage of the right-of-way.
13 SR 2046
August 21, 2007
Official Publication of the State of Minnesota
Revisor of Statutes