An NPDES/SDS construction storm water permit is required if:
the commissioner determines that a discharge may cause or contribute to a violation of an applicable state or federal water quality rule or regulation. In making this determination, the commissioner shall consider factors including size of discharge, quantity and nature of discharge, and location of discharge.
Owners and operators proposing activities that require a construction storm water permit under this part must submit a complete permit application provided by the agency before conducting construction activity, or where a construction site is covered under an existing construction storm water permit, meet the subdivision registration requirements under part 7090.2060, if applicable.
The permit application or subdivision registration required under item A may be submitted electronically if such a method of submittal is approved by the commissioner. Notwithstanding the conditions of the construction storm water permit, the effective date of a permit under an electronic submittal must be established by the commissioner.
Owners and operators of construction activities required to have a construction storm water permit under this part that fail to submit a permit application or subdivision registration under subpart 2 shall comply with the storm water discharge design requirements, construction activity requirements, and the requirements of Appendix A in the construction storm water permit as incorporated by reference in part 7090.0060.
MS s 115.03
30 SR 125
October 2, 2007
Official Publication of the State of Minnesota
Revisor of Statutes