Site and soil information gathered in parts 7081.0160 and 7081.0170 must be interpreted for suitability for MSTS siting, design, and construction, with consideration of the following:
surface features impacts from precipitation, run-on, and interflow or any other item that could have potential to adversely impact the ability of the soil to accept water;
site conditions affecting system layout, distribution system requirements, and constructability;
Systems proposed to be located in flood fringes must determine feasibility of relocating the system outside the floodplain.
The limiting layer in the soil shall be determined based on the depth of bedrock or periodically saturated soil if encountered. The depth to the periodically saturated soil shall be determined according to part 7080.1720, subpart 5, item E, and the depth of bedrock shall be as defined under part 7080.1100, subpart 8.