If the commissioner determines that the results of the evaluation are not adequate to determine whether the waste is hazardous, the commissioner may require the person to conduct an additional evaluation. The commissioner shall notify the person in writing of such determination, the reasons therefor, and the additional tests that must be run or additional data that must be obtained. If the results of the additional evaluation are not reported to the commissioner within 30 days of the request, the waste must be managed as a hazardous waste and the person who produces the waste must be considered a generator until the commissioner has determined whether the waste is hazardous or not. The commissioner may grant additional time for evaluation when the person demonstrates that an extension is necessary.
MS s 116.07
9 SR 115; L 1987 c 186 s 15
October 10, 2013
Official Publication of the State of Minnesota
Revisor of Statutes