The owner or operator of the emission facility shall submit a test report and any additional information required by the applicable requirement, compliance document, or test plan. A report shall be submitted for any performance test that was required pursuant to part 7017.2020, subpart 1, whether or not the test data indicates compliance with the applicable emission limits or operating conditions and whether or not the test was completed according to the approved test plan.
The performance test report shall be postmarked or received within 45 days following completion of the performance test unless an alternate schedule is given in the applicable compliance document. The owner or operator of the emission facility may request in the test plan that the submittal deadline be extended by up to 15 days if the complexity of the test schedule or the laboratory analysis is such that submittal within 45 days is impractical.
The owner or operator of the emission facility shall provide to the commissioner a microfiche copy of the performance test report to be postmarked or received within 60 days of the deadline for submittal of the test report. The complete permit file number, complete emission facility name, and exact date of testing shall be provided.
The report shall include the following elements:
Certification: signed and dated certification statements in the format required by part 7017.2040.
Introduction:
reason for testing, for example, required by permit or notice of violation, including permit number or name of other applicable compliance document;
Operating parameters: readings of discrete data from monitoring instruments must be recorded at least every 15 minutes or other reasonable time interval as approved by the commissioner during the test and strip charts or retrieved electronic data from continuous monitors must be included in the test report:
Maintenance: description, including dates, of all maintenance and operational inspections, including major cleaning operations and replacement, repair, or modification of functional components of process or control equipment done in the month prior to the test.
Sampling and analysis procedures:
sampling port location and dimensioned cross section, showing all flow disturbances including elbows, dampers, fans, constrictions, and collection equipment;
brief description of sampling procedures and analytical methods, with discussion of deviations from standard methods, including a statement of source methods used, but not including complete copies of reference methods in the report; and
if a method other than a United States EPA reference method was used, statement of the detection limit and the level of accuracy of the method under the conditions of the test and at the concentration of air pollutant that is reported.
Appendix:
complete results, including any fuel analysis, with example calculations, showing equations used and actual results in equation form on same or adjacent pages, using applicable equations shown in the reference method;
raw production data, signed by plant official who can interpret the data and can be held accountable for the data;
calibration procedures and results, including Pitot tube, nozzle, meter box, thermometer, and barometer calibrations;
a copy of the most recent version of the test plan and a copy of the commissioner's written approval of the test plan.
MS s 116.07
18 SR 1412; 23 SR 145
November 29, 2007