The owner or operator of the emission facility shall prepare and submit a certification test report to the commissioner. A report must be submitted for any certification test that was required, whether or not the test data indicate compliance with the appropriate performance specifications, and whether or not the test was completed according to the approved test plan.
The certification test report must be postmarked or received within 45 days following completion of the certification test unless an alternate schedule is given in the applicable compliance document.
The owner or operator of the emission facility shall submit a microfiche copy of the certification test report to be postmarked or received within 105 days following completion of the certification test. A cover letter which certifies that the microfiche is an exact and complete copy of the original test report must be submitted with the microfiche copy of the test report.
Each certification test report shall contain the following information and be in the format shown in items A to D:
Introduction:
facility permit identification number and the date and title of the compliance document which required the certification test;
General information:
names and titles of testing and facility personnel who conducted or assisted with the test; and
drawing of monitoring system probe location for extractive systems, or monitor location for in situ systems, showing its relationship to the nearest flow disturbances both up and downstream of the probe.
Test results: a summary table which compares the certification test results to the standards in the applicable performance specifications of Code of Federal Regulations, title 40, part 60, appendix B.
MS s 116.07
23 SR 1764
November 29, 2007
Official Publication of the State of Minnesota