Part | Title |
---|---|
6135.0100 | POLICY. |
6135.0200 | DEFINITIONS. |
6135.0300 | SEVERABILITY. |
6135.0400 | FEE SCHEDULES. |
6135.0500 | [Repealed, 15 SR 1362] |
6135.0510 | [Repealed, 28 SR 545] |
6135.0520 | RATE TABLE I, NARROW UNDERWATER CROSSINGS. |
6135.0600 | [Repealed, 15 SR 1362] |
6135.0610 | [Repealed, 28 SR 545] |
6135.0620 | RATE TABLE II, WIDE UNDERWATER CROSSINGS. |
6135.0700 | [Repealed, 15 SR 1362] |
6135.0710 | [Repealed, 28 SR 545] |
6135.0720 | RATE TABLE III, OVERWATER CROSSINGS. |
6135.0800 | [Repealed, 15 SR 1362] |
6135.0810 | [Repealed, 28 SR 545] |
6135.0820 | RATE TABLE IV, PUBLIC LAND CROSSINGS. |
6135.1000 | PROTECTING THE ENVIRONMENT. |
6135.1100 | STANDARDS FOR ROUTE DESIGN. |
6135.1200 | STANDARDS FOR STRUCTURE DESIGN. |
6135.1300 | CONSTRUCTION METHODS. |
6135.1400 | SAFETY CONSIDERATIONS. |
6135.1500 | RIGHT-OF-WAY MAINTENANCE. |
6135.1600 | RELATIONSHIP TO OTHER LAWS. |
6135.1700 | LICENSE CONDITIONS. |
6135.1800 | CANCELLATION OF LICENSE. |
6135.2500 | [Renumbered 6244.2100] |
6135.2600 | [Renumbered 6244.2200] |
6135.2700 | [Renumbered 6244.2300] |
6135.2800 | [Renumbered 6244.2400] |
6135.2900 | [Renumbered 6244.2500] |
6135.3000 | [Renumbered 6244.2600] |
6135.3100 | [Renumbered 6244.2700] |
6135.3200 | [Renumbered 6244.2800] |
6135.3300 | [Renumbered 6244.2900] |
6135.3400 | [Renumbered 6244.3000] |
6135.3500 | [Renumbered 6244.3100] |
6135.3600 | [Renumbered 6244.3200] |
6135.3700 | [Renumbered 6244.3300] |
6135.4500 | [Renumbered 6136.0100] |
6135.4600 | [Renumbered 6136.0200] |
6135.4700 | [Renumbered 6136.0300] |
6135.4800 | [Renumbered 6136.0400] |
6135.4900 | [Renumbered 6136.0500] |
6135.5000 | [Renumbered 6136.0600] |
Pursuant to Minnesota Statutes, section 84.415, as amended by Laws 1973, chapter 479, section 1, the commissioner of natural resources hereby establishes rules concerning utility crossings over public lands and waters under the control of the commissioner, setting forth fees, standards, and criteria for minimizing the environmental impact of such crossings.
MS s 84.415
October 8, 2013
"Electric transmission" means lines, cables, or conduits used to transport large blocks of power between two points, generally, 69 kilovolt-amperes or more. As distinguished from "distribution" which means lines, cables, or conduits used to distribute power to the utility company's customers, generally, less than 69 kilovolt-amperes.
MS s 84.415
June 11, 2008
The provisions of these rules are severable, and the invalidity of any lettered or numbered paragraph, subparagraph, or subdivision thereof, shall not invalidate any other part.
MS s 84.415
June 11, 2008
The following fees defray administrative costs and provide a reasonable return for private use of public land or water.
The applicant shall include $500 with each application for a license to construct utility crossings over or under public lands. An application may contain more than one crossing.
The applicant shall include $500 with each application for a license to construct utility crossings over or under public waters. An application may contain more than one crossing. In the case of underwater crossings, the application fee charged shall satisfy the application fee requirements of parts 6115.0010 to 6115.0100 but the crossings shall be subject to all inspection and monitoring fees required by law or regulation.
The checks shall be made payable to the commissioner of management and budget. The commissioner will acknowledge the receipt of the application, indicating whether or not the correct application fee was included. The commissioner will take no other action on the application until the commissioner has received the correct fee. The commissioner will not return application fees, even if the application is withdrawn or denied.
One-time payment fees securing a 50-year license, made payable to the state treasurer, shall be established for two classes of utility crossings as follows:
Fees for crossing of public waters:
for utility crossings under public waters involving a disturbance of less than ten feet in width at the water's edge, Rate Table I in part 6135.0520 shall apply;
An applicant may request a 25-year license instead of a 50-year license. In such a case, a one-time payment fee securing a 25-year license shall be established based on 60 percent of the fee for a 50-year license as computed under subpart 3 and Rate Tables I to IV in parts 6135.0520 to 6135.0820.
At the end of the license period if both parties wish to renew, the renewal fee and time period will be determined by such methods as are developed by the commissioner or a successor.
Application fees required under these parts shall be charged for all applications received after the effective date of these parts.
The license fees required under these rules shall apply to all licenses which have not been fully executed at the effective date of these parts.
MS s 84.415; L 2003 c 128 art 1 s 158
15 SR 1362; L 2003 c 112 art 2 s 50; 28 SR 545; L 2009 c 101 art 2 s 109
August 7, 2009
[Repealed, 15 SR 1362]
June 11, 2008
[Repealed, 28 SR 545]
June 11, 2008
The following table applies to underwater crossings involving a disturbance of less than ten feet in width at the water's edge.
Total Length in Feet, All Crossings Per Application | ||||||
Type of Utility | 0-100 | 101 -200 | 201 -300 | 301 -400 | 401 -500 | 500+ |
BASE RATE | ||||||
Pipeline | $237 | $293 | $349 | $406 | $462 | $462 plus $56 per 100 feet or fraction thereof additional |
Electric Transmission | 180 | 225 | 259 | 304 | 349 | $349 plus $45 per 100 feet or fraction thereof additional |
Electric Distribution, Telephone, Telegraph, and Fiberoptic | 124 | 147 | 180 | 203 | 237 | $237 plus $17 per 100 feet or fraction thereof additional |
The length of an underwater crossing is measured by the number of feet of line between banks or shores. The license fee is determined by adding the length of all such underwater crossings on the same application and, using this total distance, selecting the appropriate column to determine the base rate. The license fee is the base rate plus $28 for each crossing in excess of one listed in the application.
Example #1. Electric distribution line application. Five water crossings.
Length (feet) | ||||
Crossing #1 | 40 | Base rate | $147 | (from 101-200 feet column) |
Crossing #2 | 10 | Plus | 112 | (four crossings in excess of one) |
Crossing #3 | 75 | ----- | ||
Crossing #4 | 22 | License fee | 259 | |
Crossing #5 | 35 | |||
--- | ||||
Total | 182 |
Example #2. Pipeline application. One crossing.
Crossing #1, 650 feet | Base rate | $574 | (from the 500+ column) |
Plus | $ 0 | (no crossings in excess of one) | |
------ | |||
License fee | $574 |
MS s 14.388; L 2003 c 128 art 1 s 158
28 SR 545
June 11, 2008
[Repealed, 15 SR 1362]
June 11, 2008
[Repealed, 28 SR 545]
June 11, 2008
The following table applies to underwater crossings involving a disturbance of ten feet or more in width at the water's edge.
Total Length in Feet Per Each Crossing | ||||||
Type of Utility | 0-100 | 101 -200 | 201 -300 | 301 -400 | 401 -500 | 500+ |
RATE PER CROSSING | ||||||
Pipeline | $293 | $361 | $440 | $507 | $575 | $575 plus $73 per 100 feet or fraction thereof additional |
Electric Transmission | 225 | 270 | 327 | 383 | 440 | $440 plus $56 per 100 feet or fraction thereof additional |
Electric Distribution, Telephone, Telegraph, and Fiberoptic | 147 | 192 | 225 | 259 | 293 | $293 plus $39 per 100 feet or fraction thereof additional |
The length of an underwater crossing is measured by the number of feet of line between banks or shores. The license fee is determined by calculating separately the length of each crossing on the same application, finding the rate for each crossing by referring to the appropriate column, and then adding together the resulting rate determinations.
Example. Pipeline application. Three underwater crossings.
Length (feet) | Rate | ||
Crossing #1 | 461 | $575 | |
Crossing #2 | 24 | 293 | |
Crossing #3 | 231 | 440 | |
License fee | $1,308 |
MS s 14.388; L 2003 c 128 art 1 s 158
28 SR 545
June 11, 2008
[Repealed, 15 SR 1362]
June 11, 2008
[Repealed, 28 SR 545]
June 11, 2008
The following table applies to overwater crossings.
Total Length in Feet, All Crossings Per Application | ||||||
Type of Utility | 0-100 | 101 -200 | 201 -300 | 301 -400 | 401 -500 | 500+ |
BASE RATE | ||||||
Pipeline | $361 | $473 | $575 | $687 | $789 | $789 plus $113 per 100 feet or fraction thereof additional |
Electric Transmission | 293 | 383 | 462 | 552 | 631 | $631 plus $90 per 100 feet or fraction thereof additional |
Electric Distribution, Telephone, Telegraph, and Fiberoptic | 225 | 282 | 349 | 417 | 473 | $473 plus $68 per 100 feet or fraction thereof additional |
The length of an overwater crossing is measured by the number of feet of line between banks or shores. The license fee is determined by adding the length of all such overwater crossings on the same application and, using this total distance, selecting the appropriate column to determine the base rate. The license fee is the base rate plus $28 for each crossing in excess of one listed in the application.
Example. Telephone line application. Three overwater crossings.
Length (feet) | ||||
Crossing #1 | 27 | Base Rate | $225 | (from 0-100 feet column) |
Crossing #2 | 31 | Plus | 56 | (two crossings in excess of one) |
Crossing #3 | 10 | ------ | ||
----- | License fee | 281 | ||
Total | 68 |
MS s 14.388; L 2003 c 128 art 1 s 158
28 SR 545
June 11, 2008
[Repealed, 15 SR 1362]
June 11, 2008
[Repealed, 28 SR 545]
June 11, 2008
The following table applies to public land crossings.
Width in Feet of Right-of-Way | ||||||
Type of Utility | 0-66 | 67-99 | 100-132 | 133-165 | 166-198 | 198+ |
RATE PER ROD OF LENGTH OF CROSSING | ||||||
Pipeline | $4.40 | $6.54 | $8.68 | $10.82 | $12.96 | $15.10 |
Electric Transmission | 2.93 | 4.40 | 5.75 | 7.21 | 8.68 | 10.03 |
Electric Distribution, Telephone, Telegraph, and Fiberoptic | 1.47 | 2.25 | 2.93 | 3.61 | 4.40 | 5.07 |
Example #1. Electric transmission line request: 100 foot right-of-way, across two descriptions of public land, 1,320 feet in length for each description.
Total length in feet of public land crossing | 2,640 |
Total length in rods (16.5 feet/rod) | 160 |
----- | |
License fee at $5.75 per rod (Rate Table IV) | $920 |
Example #2. Pipeline request: 75 foot right-of-way, 400 feet across public land.
Total length in rods (16.5 feet/rod) | 24.24 |
License fee at $6.54 per rod (Rate Table IV) | $158.53 |
If an additional crossing is to be placed in an existing right-of-way by the original licensee or any other licensee, the fee will be 50 percent of the amount which would be charged if this crossing were the original crossing in the right-of-way.
If the appraised value of the land over which a utility will cross is over $100 per acre, a fee in addition to that contained in Rate Table IV will be charged. The additional fee shall not exceed 15 percent of the appraised value in excess of $100 per acre of the actual acreage being taken by the right-of-way.
MS s 14.388; L 2003 c 128 art 1 s 158
28 SR 545
June 11, 2008
It is essential to regulate utility crossings of public lands and waters in order to provide maximum protection and preservation of the natural environment and to minimize any adverse effects which may result from utility crossings. These standards and criteria provide a basic framework of environmental considerations concerning such a proposed crossing. The standards deal with route design, structure design, construction methods, safety considerations, and right-of-way maintenance.
For each environmental standard listed in these parts, the applicant shall indicate whether the applicant is satisfying the standard, where applicable, or if not, why not. In dealing with route design standards, the application must, where applicable, also supply data on relevant site conditions. Except when the commissioner determines that it is not feasible and prudent, or not in the best interests of the environment, the applicant shall comply with the following standards in designing, constructing, and maintaining utility crossings.
MS s 84.415
17 SR 1279
June 11, 2008
With regard to topography:
avoid creating tunnel vistas by, for example, building deflections into the route or using acceptable screening techniques.
With regard to vegetation:
run along fringe of forests rather than through them, but if it is necessary to route through forests, then utilize open areas in order to minimize destruction of commercial forest resources.
With regard to soil characteristics:
avoid soils whose high susceptibility to erosion would create sedimentation and pollution problems during and after construction;
With regard to crossing of public waters:
avoid streams, but if that is not feasible and prudent, cross at the narrowest places wherever feasible and prudent, or at existing crossings of roads, bridges, or utilities; and
avoid lakes, but where there is no feasible and prudent alternative route, minimize the extent of encroachment by crossing under the water.
Crossings on or under the beds of streams designated by the commissioner as trout waters shall be avoided unless there is no feasible alternative. When unavoidable, maximum efforts shall be taken to minimize damage to trout habitat.
With regard to special use areas, which are those areas designated under Minnesota Statutes, section 84.033, as scientific and natural areas; those areas designated pursuant to Minnesota Statutes, section 103F.325, as units of the Minnesota Wild and Scenic River System; and those areas subject to special regulation for recreational, scenic, natural, scientific, or environmental purposes:
avoid them, but if there is no feasible alternative route, then utilities shall be placed underground; and
MS s 84.415
October 8, 2013
With regard to locating the utility overhead or under the ground or water:
Primary consideration shall be given to underground and underwater placement in order to minimize visual impact. If the proposal is for overhead placement, the applicant shall explain the economic, technological, or land characteristic factors, which make underground placement infeasible. Economic considerations alone shall not be the major determinant.
If overhead placement is necessary, the crossing shall be hidden from view as much as practicable.
With regard to the appearance of the structures, they shall be made as compatible as practicable with the natural area with regard to: height and width, materials used, and color.
MS s 84.415
June 11, 2008
When crossing roads or rivers, leave a screen of vegetation between the structures and the road or river.
When crossing under public waters, take steps to prevent excessive erosion of lake or stream banks and construct temporary sediment traps to reduce sedimentation.
Construct across wetlands in the winter in order to minimize damage to vegetation and in order to prevent erosion and sedimentation.
Construct at times when local fish and wildlife are not spawning or nesting.
MS s 84.415
June 11, 2008
Applicants for crossings of electrical transmission lines and pipelines shall adhere to federal and state safety regulations, both with regard to prevention (such as safety valves and circuit breakers) and with regard to emergency procedures in the event of failure (fire suppression, oil spill cleanup).
In order to ensure adequate safety for commercial or recreational navigational uses of waterways, overhead crossings shall be constructed at adequate heights to provide maximum safety compatible with existing or potential navigational uses.
MS s 84.415
June 11, 2008
Natural vegetation of value to fish or wildlife, which does not pose a hazard to or restrict reasonable use of the utility, shall be allowed to grow in the right-of-way.
Where vegetation has been removed, new vegetation consisting of native grasses, herbs, shrubs, and trees, recommended by the commissioner shall be planted and maintained on the right-of-way.
Chemical control of vegetation shall be in accordance with rules, regulations, and other requirements of all state and federal agencies with authority over the use.
MS s 84.415
June 11, 2008
There are other Minnesota and federal laws and rules and regulations concerned with utility crossings and the environment. In case of conflict with other environmental regulations, the parts included herein will be subordinated to any law, rule, or regulation which is stricter in its protection of the environment. Other related environmental laws and rules and regulations include but are not limited to those associated with:
MS s 84.415
June 11, 2008
In granting a license, the commissioner may include therein any terms, conditions, or reservations which may be necessary to minimize the adverse effect on the environment or to carry out the policies of these parts.
MS s 84.415
June 11, 2008
Upon violation of any of the terms, conditions, or reservations contained in a license, the commissioner may cancel any license granted under these parts.
MS s 84.415
June 11, 2008
[Renumbered 6244.2100]
June 11, 2008
[Renumbered 6244.2200]
June 11, 2008
[Renumbered 6244.2300]
June 11, 2008
[Renumbered 6244.2400]
June 11, 2008
[Renumbered 6244.2500]
June 11, 2008
[Renumbered 6244.2600]
June 11, 2008
[Renumbered 6244.2700]
June 11, 2008
[Renumbered 6244.2800]
June 11, 2008
[Renumbered 6244.2900]
June 11, 2008
[Renumbered 6244.3000]
June 11, 2008
[Renumbered 6244.3100]
June 11, 2008
[Renumbered 6244.3200]
June 11, 2008
[Renumbered 6244.3300]
June 11, 2008
[Renumbered 6136.0100]
June 11, 2008
[Renumbered 6136.0200]
June 11, 2008
[Renumbered 6136.0300]
June 11, 2008
[Renumbered 6136.0400]
June 11, 2008
[Renumbered 6136.0500]
June 11, 2008
[Renumbered 6136.0600]
June 11, 2008
Official Publication of the State of Minnesota
Revisor of Statutes