Surface overburden portions of pitwalls shall be designed and constructed to either of the following standards:
The final exterior slopes shall consist of benches and lifts as follows:
the toe of the surface overburden portion shall be set back at least 20 feet from the crest of the rock portion of the pitwall;
lift heights shall range from 40 to 60 feet and shall be selected based on the need to protect public safety; the location of the pitwall in relation to the surrounding land uses; the soil types and their erosion characteristics; the variability of overburden thickness; and the potential uses of the pit following mining;