Portions of a mining operation for which there is flexibility in site selections, such as stockpiles, tailings basins, water reservoirs, processing plants, offices interconnecting roadways and auxiliary facilities, shall be sited so that:
potential injury to life, property, and natural resources due to dam or slope failure is minimized;
major modifications of watersheds, including diversions of surface water and alterations of groundwater levels are minimized;
spilled material resulting from pipeline rupture or emergency release can be contained and controlled;
conflicts with natural resource sites identified by the commissioner such as those listed in V 21 Natural Resources Sites, Minesite Data Manual, Minnesota Department of Natural Resources, are minimized.
MS s 93.47
June 11, 2008
Official Publication of the State of Minnesota
Revisor of Statutes