The following tasks have a maximum cost as listed in items A to D when one of these technologies is used: hollow-stem auger, mud or air rotary, air coring, or rotosonic, or when the tasks are necessary for well sealing:
mobilization/demobilization (drilling) (51 to 500 miles one way), $585 plus $10 per mile over 50 miles;
MS s 115C.07
28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f); 28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f); 28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f); 28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f)
October 5, 2022
Official Publication of the State of Minnesota
Revisor of Statutes