Costs for well installation of an at-grade well are as described in this part.
Hollow-stem auger in sand, silt, or clay, with continuous sampling:
subitems (1) and (2) list the depth of the well and the maximum cost per two-inch PVC well, and subitems (3) and (4) list the depth of the well and the maximum cost per two-inch well (steel riser with PVC screen):
subitems (1) and (2) list the depth of the well and the maximum cost per four-inch PVC well, and subitems (3) and (4) list the depth of the well and the maximum cost per four-inch well (steel riser with PVC screen):
subitems (1) and (2) list the depth of the well and the maximum cost per six-inch PVC well, and subitems (3) and (4) list the depth of the well and the maximum cost per six-inch well (steel riser with PVC screen):
Mud or air rotary in limestone or hard rock, with surface sampling only:
subitems (1) to (4) list the depth of the well and the maximum cost per two-inch well (steel riser with PVC screen):
subitems (1) to (4) list the depth of the well and the maximum cost per four-inch well (steel riser with PVC screen):
subitems (1) to (4) list the depth of the well and the maximum cost per six-inch well (steel riser with PVC screen):
Air coring in limestone or hard rock, with continuous sampling:
subitems (1) to (4) list the depth of the well and the maximum cost per two-inch well (steel riser with PVC screen):
subitems (1) to (4) list the depth of the well and the maximum cost per four-inch well (steel riser with PVC screen):
subitems (1) to (4) list the depth of the well and the maximum cost per six-inch well (steel riser with PVC screen):
Rotosonic drilling in sand, silt, or clay, with continuous sampling:
subitems (1) and (2) list the depth of the well and the maximum cost per two-inch PVC well, and subitems (3) and (4) list the depth of the well and the maximum cost per two-inch well (steel riser with PVC screen):
subitems (1) and (2) list the depth of the well and the maximum cost per four-inch PVC well, and subitems (3) and (4) list the depth of the well and the maximum cost per four-inch well (steel riser with PVC screen):
subitems (1) and (2) list the depth of the well and the maximum cost per six-inch PVC well, and subitems (3) and (4) list the depth of the well and the maximum cost per six-inch well (steel riser with PVC screen):
MS s 115C.07
28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f); 28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f); 28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f); 28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f)