2890.3300 SOIL BORING ADVANCEMENT.
§
Subpart 1.
General.
Costs for soil boring advancement are as described in this part.
§
Subp. 2.
Hollow-stem auger.
Hollow-stem auger drilling in sand, silt, or clay, with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
§
B.
26 - 50 feet, $847 plus $29 per foot beyond 25 feet;
§
C.
51 - 100 feet, $1,573 plus $29 per foot beyond 50 feet; and
§
D.
over 100 feet, $4,114 plus $64 per foot beyond 100 feet.
§
Subp. 3.
Mud or air rotary.
Mud or air rotary drilling in limestone or hard rock, with surface sampling only. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $1,543;
§
B.
26 - 50 feet, $1,543 plus $48 per foot beyond 25 feet;
§
C.
51 - 100 feet, $2,753 plus $56 per foot beyond 50 feet; and
§
D.
over 100 feet, $5,536 plus $73 per foot beyond 100 feet.
§
Subp. 4.
Air coring.
Air coring of limestone or hard rock with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $1,694;
§
B.
26 - 50 feet, $1,694 plus $55 per foot beyond 25 feet;
§
C.
51 - 100 feet, $3,066 plus $57 per foot beyond 50 feet; and
§
D.
over 100 feet, $5,899 plus $81 per foot beyond 100 feet.
§
Subp. 5.
Rotosonic drilling.
Rotosonic drilling in sand, silt, or clay, with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $1,755;
§
B.
26 - 50 feet, $1,755 plus $72 per foot beyond 25 feet;
§
C.
51 - 100 feet, $3,540 plus $77 per foot beyond 50 feet; and
§
D.
over 100 feet, $7,412 plus $101 per foot beyond 100 feet.
History:
28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f)